VINHOMES Co LOA
Vinhomes Co Loa benefits from urban railway line No. 4, with a route starting from Me Linh, passing through Sai Dong and ending at Lien Ha. The section through the project is 2.5 km long, with two pick-up stations at the public center and exhibition fair.